Balmoral Hall

Contractor

2018

Project Start

Winnipeg, Manitoba

Location

Structural

Miscellaneous

Joists

Decking

Balmoral Hall

Imperial Metal is so excited to be a part of a facility that will aid in helping girls explore their creative side. This building and its state of the art equipment will offer them every opportunity to succeed! The centre will become the prominent, inspiring for student collaboration on campus, providing:

  • virtual reality, 3D modelling, and prototype engineering
  • performing arts, including vocal and instrumental recording as well as movement classes
  • fine arts, graphic design, video production, and more

Our portion of the structure went up prior to 2019. Some complexities were the connection to the panels on our structure, the window openings and all the connections to hollowcore. Our 3D modelling software allowed us to be able to determine some of these issues prior to fabrication.

Related Projects

555 Main St

Bison Pointe Condos

Oaks on St. Mary’s